REQUIREMENTS |
PRODUCT |
METHODOLOGY |
Concrete Slabs |
4mm Torch-On |
• Clean surface (Dust free) • Saturate surface with bituprimer 88% for Best adhesion • Fully bond by Heat Welding 4mm torch-on to surface • Include welding to outlets and to vertical walls • Overlaps to be 75mm, Butt joins to be 100mm, up-laps to be 100mm • Saturate with Bitumen Silver UV protective agent |
Corrugated Roof IBR (Inverted box rib)
|
Polyester / Glass fiber membrane applied to bolt heads, lap and butt joints |
• Clean and prepare area • Coat surface with either bitumen or acrylic bonding liquid • Lay Polyester membrane into liquid • Re-coat surface with either bitumen or acrylic bonding liquid • Finish with UV stable final coat |
Expansion Jointing |
Expanding Foam and Polyurethane systems |
• Clean out Expansion joint (Dust free) • Clearwet dual surfaces • Install PU-Foam into crevice 5cm deep • Allow to dry approx 2 hours • Extract excess with extracting tool • Clean surface and apply primer • Install colour matched polyurethane to surface • Smooth polyurethane with application tool |
Patios & Balconies |
Cementitious latex based system |
• Remove debris from working surface • Clearwet surface for application • Apply cementitious substrate to area • Overlay area with polyfelt non woven micro fiber material • Re-apply cementitious curing agent solution to polyfelt micro fibre |
Showers & Bathrooms |
Cementitious latex based system |
• Remove debris from working surface • Clearwet surface for application • Apply cementitious ubstrate to area • Overlay area with polyfelt micro fibre material uplap 2M • Re-apply cementitious curing agent solution to polyfelt micro fibre |
Parapet walls |
Membrane Systems |
• Clean parapet walls (Dust free) • Coat surface with either bitumen or acrylic bonding liquid • Lay Polyester membrane onto liquid • Re-coat surface with either bitumen or acrylic bonding liquid • Finish with UV stable final coat or final colour |
Tanking |
3-4mm Torch-On |
• Clean surface (Dust free) • Saturate vertical surface with bituprimer • Heat Welding 3-4mm Torch-On to vertical surface / foundation • Overlaps to be 100-300mm dependant upon spec • Preferably install softboard against waterproofing |
Tanking with Drainage |
3-4mm Torch-On |
• Clean surface (Dust free) • Saturate surface with bituprimer • Heat Welding 3-4mm Torch-On to vertical surface / foundation • Overlaps to be 100-300mm dependant upon spec • Install 110mm Geo drainage pide for correct flow • Install Polyproperlene material over pipe area • Install drainage pide for correct flow • Install 14-19mm drainage stone against wall / foundation • Install 19mm ply / hard board against waterproofed area |
Damp Proofing |
Cementitious latex based system |
• Remove debris from working surface • Clearwet surface for application • Application of cementitious substrate to area • Re-Apply to areas 3-4 times @35 degree angles to last |